• Blog
  • Boat | HR 342
  • HR 29 (Dolphin Dance I)
  • Season 2010
  • Season 2011
  • Season 2012
  • Seasons 2013-2018
  • Baltic Sea Top 10

S/Y Dolphin Dance

Sailing Blog

toggle menu

S/Y Dolphin Dance

Sailing Blog

toggle menu

Category: maintenance

Dolphin Dance is out of the water

Posted on 17.9.2012 by sydolphindance

The coming winter is going to be a bit different for us as Dolphin Dance is going to be laid up … Continue reading “Dolphin Dance is out of the water”

end of season, maintenance 3 Comments

Hairline cracks on the rudder

Posted on 12.6.2012 by sydolphindance

One more maintenance orientated blog post from May… Last autumn, after the boat was lifted, I noticed that there were … Continue reading “Hairline cracks on the rudder”

maintenance 5 Comments

Installing a VHF-antenna

Posted on 9.6.2012 by sydolphindance

Our old masthead VHF-antenna is lying somewhere in the bottom of the Baltic Sea – last season when sailing from Öland to … Continue reading “Installing a VHF-antenna”

equipment, maintenance 3 Comments

Floating at last!

Posted on 1.6.2012 by sydolphindance

I have been working these last days around the clock to get everything ready for the 1st of June. Partly, … Continue reading “Floating at last!”

maintenance, rigging 1 Comment

Cleaning the mattresses

Posted on 30.5.2012 by sydolphindance

In the end of last season we spotted some mold spots in the back fabric of the mattresses. I think … Continue reading “Cleaning the mattresses”

maintenance 4 Comments

Four days to go!

Posted on 28.5.2012 by sydolphindance

The launch of S/Y Dolphin Dance is booked for the Friday 1st of June, so this is going to be … Continue reading “Four days to go!”

equipment, maintenance, rigging 1 Comment

Fridge compressor incorrectly installed!

Posted on 24.5.2012 by sydolphindance

I wrote a blog post earlier about installing a new compressor for the fridge. Unfortunately, the installing did not go … Continue reading “Fridge compressor incorrectly installed!”

maintenance 2 Comments

Teak deck maintenance: injecting epoxy and re-caulking

Posted on 19.5.2012 by sydolphindance

One seam between the deck and the coachroof has definitely given me a headache! I repaired it twice last season, … Continue reading “Teak deck maintenance: injecting epoxy and re-caulking”

maintenance 8 Comments

To-Do List

Posted on 11.5.2012 by sydolphindance

Our current plan is to launch S/Y Dolphin Dance in the last week of May and have the boat ready … Continue reading “To-Do List”

equipment, maintenance 1 Comment

Waxing almost done

Posted on 1.5.2012 by sydolphindance

Hopefully everyone had a nice May Day! On Monday we started, among other things, waxing the topsides of s/y Dolphin … Continue reading “Waxing almost done”

maintenance 1 Comment

Posts navigation

previous
next
Proudly powered by WordPress | Theme: brand by Massimo Sanfelice - Maxsdesign