• Blog
  • Boat | HR 342
  • HR 29 (Dolphin Dance I)
  • Season 2010
  • Season 2011
  • Season 2012
  • Seasons 2013-2018
  • Baltic Sea Top 10

S/Y Dolphin Dance

Sailing Blog

toggle menu

S/Y Dolphin Dance

Sailing Blog

toggle menu

Sailing Blog

Teak deck maintenance: injecting epoxy and re-caulking

Posted on 19.5.2012 by sydolphindance

One seam between the deck and the coachroof has definitely given me a headache! I repaired it twice last season, … Continue reading “Teak deck maintenance: injecting epoxy and re-caulking”

maintenance 8 Comments

Thoughts on bow anchor…

Posted on 15.5.2012 by sydolphindance

When cleaning the waterline stain the other day, I noted once again, that s/y Dolphin Dance is leaning slightly towards … Continue reading “Thoughts on bow anchor…”

equipment 5 Comments

Storage options

Posted on 11.5.2012 by sydolphindance

We have been trying to compare different kind of storage solutions to make it easier to store all our stuff … Continue reading “Storage options”

interior design 1 Comment

To-Do List

Posted on 11.5.2012 by sydolphindance

Our current plan is to launch S/Y Dolphin Dance in the last week of May and have the boat ready … Continue reading “To-Do List”

equipment, maintenance 1 Comment

Articles in Nautic-magazine

Posted on 8.5.2012 by sydolphindance

During April I have been working with two articles for a Finnish boating magazine Nautic and now they are published in the … Continue reading “Articles in Nautic-magazine”

Denmark, magazine, travel story 4 Comments

A weekend in Gdansk

Posted on 7.5.2012 by sydolphindance

Since the cold spring weather continues in Finland, we decided to take a break from boat maintenance tasks. Thus, we … Continue reading “A weekend in Gdansk”

Baltic Sea, Poland, travel story 3 Comments

Waxing almost done

Posted on 1.5.2012 by sydolphindance

Hopefully everyone had a nice May Day! On Monday we started, among other things, waxing the topsides of s/y Dolphin … Continue reading “Waxing almost done”

maintenance 1 Comment

Keel repair – part 1

Posted on 29.4.2012 by sydolphindance

Finally we got plenty of sunshine and a bit warmer weather this weekend so it was good time to start with the … Continue reading “Keel repair – part 1”

HR29, maintenance 3 Comments

Cleaning the topsides

Posted on 27.4.2012 by sydolphindance

The spring maintenance continues: the topsides of s/y DD are now cleaned with Hempel’s Cleaning Powder and are ready to … Continue reading “Cleaning the topsides”

maintenance 5 Comments

The first impression of new curtains

Posted on 24.4.2012 by sydolphindance

Last week, we received the fabric for the new curtains and on Saturday, I started cutting and sewing. On Sunday, … Continue reading “The first impression of new curtains”

interior design 5 Comments

Posts navigation

previous
next
Proudly powered by WordPress | Theme: brand by Massimo Sanfelice - Maxsdesign